A practical guide for engineers, EPC buyers and project owners specifying 10 kV cast-resin dry type transformers
If you have ever asked a Chinese dry-type transformer supplier for a quotation, you have probably seen model numbers like SCB10, SCB13 and SCB14 sitting next to the same kVA rating — and wondered whether the extra digits mean a different voltage class, a different manufacturer, or simply a different price.
They are not different voltage classes. They are different energy-efficiency tiers under the Chinese national standard GB 20052. The footprint, the terminals and the voltage are the same; the real difference sits inside the iron core.
This guide sets out the actual differences in no-load loss, load loss, price, payback and compliance, using the loss data from our own factory test sheets across the full 30 to 2500 kVA range. By the end you will know which series to write into your specification — and which claims on a competitor quotation deserve a second look.
What Do SCB10, SCB13 and SCB14 Actually Mean?
The model name is where most overseas buyers lose the thread, so it is worth decoding first. In the Chinese naming system for dry-type transformers, each character carries a fixed meaning.
S — three-phase.
C — cast resin encapsulated insulation, which is what makes the unit dry type.
B — copper foil winding. An L in the same position, as in SCL, means aluminium foil winding.
The trailing number — 10, 13, 14 or 18 — is the loss performance series defined by GB 20052.
So SCB14 reads as: three-phase, cast-resin dry type, copper foil winding, loss series number 14. It is not a design revision, not a factory code, and certainly not a voltage rating.
Of the three, the SCB14 is the most efficient, the SCB13 sits in the middle, and the SCB10 is the legacy unit with the highest losses.
Efficiency Tier Mapping Under GB 20052-2024
China revised its mandatory transformer efficiency standard in 2024. Under GB 20052-2024, 10 kV three-phase dry-type distribution transformers fall into three tiers, and the series numbers map onto them as follows.
Table 1. Efficiency tier mapping under GB 20052-2024
|
Model series |
Efficiency tier |
Status in the Chinese market |
|
SCB18 |
Level 1 |
Premium, advanced efficiency |
|
SCB14 |
Level 2 |
Energy-saving threshold, the standard choice for new projects |
|
SCB12 / SCB13 |
Level 3 |
Minimum allowable value |
|
SCB10 / SCB11 |
Below Level 3 |
Not permitted for new manufacture or sale in China |
Many English-language supplier pages still state that SCB13 is a Level 2 unit. That was correct under the 2020 version of the standard, but it is out of date now. In the current standard, SCB13 is a Level 3 minimum-compliant unit and SCB14 is the standard Level 2 choice. If a supplier quotes you SCB13 and calls it Level 2, that claim is worth checking against the certificate.
There is a practical consequence here too. A GB model number is not a specification on its own. In a purchase contract, write out the guaranteed no-load loss and load loss in watts rather than the series name alone. Factories interpret compliance with different amounts of headroom, and the watt figures are the only thing you can hold them to.
Side-by-Side Loss Comparison
The table below is the full 30 to 2500 kVA range taken from our own production line. Load loss is measured at 120 °C winding temperature, and the impedance column follows the usual break at 630 kVA.
Table 2. No-load loss, load loss, no-load current and impedance, 30–2500 kVA
|
Capacity (kVA) |
SCB13 no-load loss (W) |
SCB14 no-load loss (W) |
SCB18 no-load loss (W), reference |
Load loss at 120 °C (W), shared by 13/14/18 |
No-load current (%) |
Impedance (%) |
|
30 |
135 |
130 |
105 |
640 |
2.2 |
4 |
|
50 |
195 |
185 |
155 |
900 |
2.4 |
4 |
|
80 |
265 |
250 |
210 |
1,240 |
1.8 |
4 |
|
100 |
290 |
270 |
230 |
1,415 |
1.8 |
4 |
|
125 |
340 |
320 |
270 |
1,665 |
1.6 |
4 |
|
160 |
385 |
365 |
310 |
1,915 |
1.6 |
4 |
|
200 |
445 |
420 |
360 |
2,275 |
1.4 |
4 |
|
250 |
515 |
490 |
415 |
2,485 |
1.4 |
4 |
|
315 |
635 |
600 |
510 |
3,125 |
1.4 |
4 |
|
400 |
705 |
665 |
570 |
3,590 |
1.2 |
4 |
|
500 |
835 |
790 |
670 |
4,390 |
1.2 |
4 |
|
630 |
935 |
885 |
750 |
5,365 |
1.0 |
6 |
|
800 |
1,095 |
1,035 |
875 |
6,265 |
1.0 |
6 |
|
1,000 |
1,275 |
1,205 |
1,020 |
7,315 |
1.0 |
6 |
|
1,250 |
1,505 |
1,420 |
1,205 |
8,720 |
1.0 |
6 |
|
1,600 |
1,765 |
1,665 |
1,415 |
10,555 |
1.0 |
6 |
|
2,000 |
2,195 |
2,075 |
1,760 |
13,005 |
0.8 |
6 |
|
2,500 |
2,590 |
2,450 |
2,080 |
15,455 |
0.8 |
6 |
No-Load Loss: Where the Only Difference Sits
No-load loss, also called excitation loss or iron-core loss, is the power a transformer draws the moment it is energised — around the clock, regardless of how much load is connected. It depends almost entirely on the grade of grain-oriented silicon steel in the core.
The step from SCB13 to SCB14 is therefore a core-material change and nothing more: a thinner, higher-permeability lamination steel with a different annealing process. Across the range the improvement is consistent.
SCB14 versus SCB13 — about 4 to 6 per cent lower no-load loss. At 630 kVA it is 5.3 per cent, 935 down to 885 W; at 1,600 kVA it is 5.7 per cent, 1,765 down to 1,665 W.
SCB18 versus SCB13 — about 20 per cent lower. At 1,600 kVA the figure falls from 1,765 to 1,415 W, and at 2,500 kVA from 2,590 to 2,080 W. That is the genuine generational step, and it is where the Level 1 tier earns its price.
Load Loss: Identical Across SCB13, SCB14 and SCB18
This is the point most brochures skip, but it is plainly visible in our own datasheet: the load loss column is shared by all three series, because it is a single column of numbers.
Load loss, the copper loss in the winding at 120 °C, does not improve when you move from SCB13 to SCB14. The conductor section, the winding design and the turns count are the same. Run a plant at 80 per cent of rated current and an SCB14 saves you precisely nothing in load loss compared with an SCB13.
Everything you gain from the SCB14 is in the always-on core loss. That distinction matters when we come to the payback period, because it decides which part of the loss curve you are actually buying down.
Same Footprint, Same Terminals
Across the SCB10, 11, 12, 13, 14 and 18 series, overall dimensions, lifting points, cable entries and cooling-fan interfaces are effectively interchangeable. Replacing an ageing SCB10 in an existing electrical room with an SCB14 normally does not require a new concrete plinth or re-engineered busbars, which is why retrofit projects are the easiest place to justify the upgrade.
Other Specs That Are Identical
The following parameters are the same on SCB13 and SCB14 units leaving our works, so nothing upstream or downstream of the transformer changes when you switch series.
High voltage 10 kV with an off-circuit tap range of ±2 × 2.5 per cent; low voltage 0.4 kV.
Vector group Dyn11, three phase, 50 Hz.
Cooling AN/AF, that is natural air with forced air available.
Insulation class F, with a permissible temperature rise of 100 K.
Lightning impulse withstand 75 kV; power-frequency withstand 35 kV on the high-voltage side and 5 kV on the low-voltage side for one minute.
Partial discharge below 10 pC, at altitudes below 1,000 m.
Price Difference and Payback Period
Typical Price Delta
Because the SCB13 to SCB14 step only swaps the grade of core steel, the price gap is much narrower than a generational jump such as oil-immersed S13 to S18, where the whole magnetic circuit and often the tank change as well.
On 2026 FOB Qingdao pricing the difference is typically 3 to 6 per cent of unit price. For a 1,600 kVA unit that is roughly US$1,000 to US$1,500 of extra capital cost. SCB18 carries a further premium on top, reflecting the more advanced core steel again.
Does the Premium Pay for Itself?
The arithmetic is straightforward, and you can run it on any quotation you receive.
Annual energy saved (kWh) = (no-load loss difference in W × 8,760 + load loss difference in W × load factor squared × loaded hours) ÷ 1,000.
Now the part most articles leave out. Because SCB13 and SCB14 share the same load loss in our range, the second term in that formula is zero. Every watt you save is core loss, and it accumulates 24 hours a day for as long as the transformer is energised.
Take a 1,600 kVA unit in a data centre that runs continuously. The no-load difference is 100 W, so the annual saving is 100 × 8,760 ÷ 1,000, which is 876 kWh. At US$0.10 per kWh that is US$88 a year; at US$0.15, a realistic commercial tariff in much of Europe, it is US$131. Against a US$1,200 premium, the payback lands somewhere between nine and fourteen years.
A 2,500 kVA unit in a three-shift factory gives a 140 W difference, or 1,226 kWh a year, worth about US$123 at US$0.10 per kWh. Against a premium of roughly US$1,800, payback is around fifteen years.
The Honest Verdict
We are not going to tell you that the SCB14 pays for itself in two years, because the numbers do not say that. On electricity cost alone, payback against the SCB13 runs roughly nine to fifteen years, which is half to two-thirds of the service life a transformer is bought for.
We still recommend the SCB14 for most new projects, for three reasons that never appear in the electricity bill.
Compliance. Where a market enforces a minimum energy performance standard — EU Ecodesign, Saudi SASO, Malaysian SIRIM and similar schemes — an SCB13 may simply not clear customs. The SCB14 is the safe specification.
Green building and reporting. LEED, BREEAM and corporate net-zero commitments increasingly require Level 2 equipment or better, and the transformer is one of the easier line items to satisfy.
Heat, not just kilowatt-hours. Every 100 W of no-load loss is heat dumped into the transformer room for 8,760 hours a year, and that heat has to be removed by the HVAC system. Once cooling load is counted, the effective saving is close to double the direct electricity figure.
When Does SCB10 Still Make Sense?
Only in narrow cases: temporary power for a construction site, an events supply you will scrap in two or three years, or a remote project with no efficiency requirement and a hard budget ceiling.
Note the compliance position. Under GB 20052-2024 the SCB10 sits below the minimum allowable value and is no longer legally manufactured for new sale in China. A new SCB10 offered today is old stock, a rebadged unit, or equipment destined for a market that does not check. None of those three is a good reason to buy one for a permanent installation.
Which One Should You Choose?
Read the conditions that fit your project rather than the price list. In practice the decision usually settles itself once the destination market and the duty cycle are known.
Choose SCB14 when
The project must meet a Level 2 efficiency rule where it is installed, whether that is a national minimum energy performance standard, a green building code or a utility rebate scheme.
The load runs continuously: data centres, hospitals, metro and airport systems, high-rise commercial buildings.
Transformer-room heat rejection and HVAC sizing matter to the design.
The asset will stay in service for more than ten years.
Choose SCB13 when
The local market only requires Level 3 or minimum compliance.
It is a general industrial plant with variable load and a tight capital budget.
It is a direct like-for-like replacement inside an existing retrofit.
Electricity is cheap, below about US$0.08 per kWh, and the payback arithmetic genuinely does not work.
Choose SCB10 only when
The equipment is genuinely temporary, with a planned life under three years.
The destination market enforces no efficiency standard at all.
You have accepted the compliance and running-cost exposure in writing.
What About SCB18?
Our data shows the SCB18 cutting no-load loss by a further 20 per cent against the SCB13 — 1,765 down to 1,415 W at 1,600 kVA. That is a real step change, and it is the right answer for hyperscale data centres, semiconductor plants and hospitals where idle loss is the dominant operating cost. The SCB18 deserves its own comparison and we cover it separately. This article stays with the three series that appear most often on Chinese quotations.
Compliance Note for Export Buyers
A Series Name on a Quotation Is Not Enough
Chinese model numbers do not map onto IEC 60076 performance levels, so a series name in a proforma invoice proves very little. Your technical specification should state, at minimum, the following.
Rated power in kVA and the full voltage combination.
Vector group, for example Dyn11.
Short-circuit impedance as a percentage.
Insulation class, temperature rise and protection level (IP00, IP20 or IP23).
Guaranteed no-load loss and load loss at 120 °C, both stated in watts.
Sound level in dB, and the IEC 60076 routine and type test reports you expect to receive.
A supplier who writes only SCB14 has left themselves room to ship a Level 3 core with a Level 4 label on it. The watt figures close that room, and they are also what your energy consultant will ask for first.
Minimum Energy Performance Standards by Market
Check the standard your destination enforces before the order is placed, not after the container arrives.
European Union — Ecodesign requirements for transformer efficiency, with tiers that align with the IEC loss classes rather than the GB series numbers.
Malaysia — SIRIM certification under the ePCS scheme, which expects a technical file and a factory inspection.
Saudi Arabia — SASO registration together with the efficiency authority requirements.
Central Asia and Africa — often no enforced standard today, but development banks and lenders increasingly apply green procurement rules to funded projects.
Tell us the destination market and we will match the loss guarantees and the documentation pack to the regulation that actually applies to your shipment.
Frequently Asked Questions
What does the B in SC(B)10, SC(B)13 and SC(B)14 mean? The B stands for copper foil winding, and an L in the same position means aluminium foil. The trailing number is the GB 20052 loss series, not a voltage rating.
Is the SCB14 actually more efficient than the SCB13? Yes, on no-load loss, by roughly 4 to 6 per cent. Load loss is identical in our range, so the saving is continuous core loss rather than a reduction under heavy load.
Can I replace an SCB10 with an SCB14 in the same location? In most cases yes. Mounting dimensions, cable entries and terminals are interchangeable across the series, but confirm the outline drawing with the manufacturer before pouring a new foundation.
What efficiency level is the SCB14 under GB 20052-2024? Level 2. The SCB18 is Level 1, and the SCB12 and SCB13 are Level 3, which is the minimum allowable value.
Is the SCB10 still manufactured in China? Not for new sale. Under GB 20052-2024 it falls below the minimum allowable value, so new production and sale in the Chinese market are no longer permitted.
Does the SCB14 cost more than the SCB13? Yes, typically 3 to 6 per cent at FOB China, which is about US$1,000 to US$1,500 on a 1,600 kVA unit.
Get the Right SCB Dry-Type Transformer for Your Project
Qingdao Junling Transformer builds the full SCB13, SCB14 and SCB18 range of 10 kV cast-resin dry-type transformers from 30 to 2,500 kVA, with copper foil windings, Dyn11 vector group, Class F insulation, AN/AF cooling and partial discharge below 10 pC. Every unit leaves our Qingdao works with routine test records, and type test reports are available on request.
We already supply project sites across Southeast Asia, the Middle East, Central Asia and Africa, and we know which documentation pack SIRIM, SASO and other destination schemes expect to see.
Send us the kVA rating, the voltage and the efficiency level your project requires. We will reply within 24 hours with a formal quotation that states the guaranteed no-load and load loss values in watts, and we can attach a sample SCB14 type test report so you can see the measured figures before you commit.